Infrastructure projects require the deployment of public resource. Hence they are always promoted in the name of public interest. But what exactly is “public interest”? Typically governments deal with this question through either one of the two approaches, which sit on the opposite ends of a spectrum.


 


The first approach is to apply traditional evaluation tools such as cost-benefit analysis, discounted cash flow analysis or internal rate of return estimates to assess whether a project is feasible. However in the context of sustainable development the limitations of these tools are obvious. For instance, how can these tools be applied to the impact on climate change? How much value should we place on conservation of water resource for future generations which may require certain sacrifice by this generation? How can we quantify the value of social equity or inequity a project may bring to the local population? Despite the hard work of many economists these traditional tools are still grossly inadequate to cope with the social and environmental dimensions that the pursuit of sustainable development now demands.


 


Hence some governments turn to the second approach: since there are so many intangibles involved in the evaluation of an infrastructure project, why not simply apply a political judgement to what the society needs? After all, many social costs and benefits are long-term, value-dependent and hard to quantify. Who can argue that politicians or governments are not in the best position to make those judgements? Indeed, this is not an uncommon approach adopted by many governments under the pretence of rational analysis. Last October the Chinese Minister of Construction Wang Guangtao, when speaking at the “Human habitat award” ceremony, warned against the huge wastage involved in so-called “Image Projects” undertaken by many local governments. His warning is a testimony to the potential pitfall of this “political judgement” approach to decision-making. Much too often it is a recipe for white elephants.


 


Let us now turn to two recent case studies.


 


Case Study 1: Water Infrastructure in Qitaihe City , China


 


Three years ago in Qitaihe, a medium-sized city in northeast China , the government was planning to upgrade its water supply system, including the construction of a new water treatment plant with a capacity of 100,000 cubic meters per day. Historically its water tariff had been set below the cost-recovery level and hence it badly needed external funding. Its challenge was how to attract sufficient investment of nearly RMB 200 million for the project. Yet no investor would put his money into the project were the water tariff not raised above at least the cost-recovery level, which would be 50% above the prevailing tariff.


 


For its urban population of around 440,000, less than one-third was connected to the central water supply system of the local water company. Half of the population was supplied by another system operated by the Coal Mining Bureau. Still around 80,000 residents living at the city fringes were not connected. They had to depend on expensive but unreliable water vendors, some of which still used donkeys to cart water in reminiscent of an age-old practice. These communities, though often much poorer, paid over RMB10 per tonne of water, about ten times what the connected residents paid to the water company.


 


It is clear that the public interests as perceived by the city centre community and the fringe community are markedly different. The wealthier community with existing water connections would prefer to enjoy continuously low water tariff, albeit with implicit government subsidy, whereas the fringe community would prefer the government to increase the water tariff charged by the local water company, so as to raise sufficient funds to invest in new pipeline network and hence connect them to the central water supply system. Since the city applied an unified water tariff system for all connected residents, the fringe communities, when connected, would be able to enjoy central water supply with more reliable service and a water tariff still seven times below what they were paying to the water vendors.


 


From the government’s perspective, its primary concern was political affordability – whether any increase in tariff would dent too much of its popularity. Its leadership was however also motivated by the political credos it might get by attracting foreign investors to the city. With regard to this infrastructure project there were at least three sets of ‘public interest’ demanding to be heard.


 


Case Study 2: Harbour Reclamation in Hong Kong


 


Now look at a current case in Hong Kong – the controversial harbour reclamation saga.


 


Hong Kong government planners traditionally see the harbour as a “plain of no resistance”. Unlike existing urban areas, once a portion of the harbour is reclaimed the government acquires automatic ownership, allowing it maximum freedom for urban planning and providing it with an immediate source of direct or indirect revenue. For public officials charged with the duty of solving traffic congestions building roads on newly reclaimed land is also the least-resistance solution. Faced with public demand for cost cutting the engineering work generated from the reclamation and other related infrastructure projects also provides an useful defence against job redundancy within many government departments.


 


From the business sector’s perspective its concerns range from contract opportunities, potential development profits, tourism attractions, to economic stimulus in general. Of course different businesses and different developers will enjoy or suffer from different cost-benefit profiles depending on the specific location and zoning of proposed reclamation.


 


On the other hand, civil society groups perceive another diverse set of public interest: protecting the environment, conserving the harbour area for future generations, improving water quality, providing opportunities to re-design the harbour front, enhancing public accessibility, increasing amenity value for disadvantaged communities, or finding sustainable solution to traffic congestions.


 


Public Interest is Public Process


 


The lessons from both cases are evident. Whilst each stakeholder can lay claim to a subset of public interest, no stakeholder, governments included, can monopolise public interest in its entirety. Neither the first “economic analysis” approach, nor the second “political judgement” approach is able to fully determine the complexity of public interest behind a project.


 


The answer is to put in place a public participatory process, backed by professional analysis, to determine the genuine public interest behind any infrastructure project. Public interest is none other than the informed consensus emerged from a legitimate, widely accepted process by all stakeholders. In short, public interest is public process.


 


The ‘public interest’ justification is only as valid as the quality of the public process per se. A poor process, or the lack of a legitimate process, demolishes the ‘public interest’ argument behind any allocation of public resource.


 


Over the last decade many cities around the world have applied sustainable development principles to their decision-making processes in strategic development. In all over 6400 cities have developed Local Agenda 21. It is now time to apply this pool of experience to the decision-making processes of major infrastructure works. The most optimal process for any particular community will of course vary from country to country, from city to city. However, a set of best practice distilled from worldwide experience has been well established and they contain some common principles related to participation, legitimacy, accountability, ownership, flexibility, equity, transparency, effectiveness, good governance and a host of other values. Learning to apply these principles will likely improve the quality of infrastructure projects, and ultimately lead to better quality of life for city-dwellers.


 


Nature of Public Private Partnership


 


Public-private partnerships (‘PPP’) are viewed by many as a means to delivering more infrastructures with less public funds. Recent experience has shown that this model can only succeed under a specific set of conditions. To understand its limitations we must first understand the nature of PPP.


 


Despite the glossy label, PPP is in essence a contractual arrangement between a government and a business enterprise. In an era of globalisation where all governments compete with each other for market-friendliness, this government-business relationship can sometimes be too cosy for comfort.


 


The other feature of PPP is that the contractual arrangement invariably extends over a long time span involving significant resources of the community. As external social or market conditions are bound to change, few contractual arrangements can stand the test of time without re-negotiation or re-structuring prior to the end of the project cycle.


 


The third notable feature in PPP is the unusual change of the government’s role from an umpire to a player, as it becomes a party to the contract, rather than a rule-setter or regulator in most other areas of governance. Most governments and government officials are not used to such change, as it requires a different mindset and a different skillset.


 


Applying SD Principles to PPP


 


Sustainable development will not succeed without the integrated effort of government, business and civil society. It is easy to note that there is a missing partner in PPP – the public as represented by civil society institutions. Just as we have seen in the previous analysis a missing partner will not only distort the representation of public interest but will also make the arrangements inherently unstable because of the lack of legitimacy.


 


From experience worldwide two remedial measures have been proven to work. The first is to establish a platform for civil society groups to participate as partners from project planning to contract negotiation. This way community values can be reflected in the contractual arrangements between government and business. Not only is public interest safeguarded, wider public acceptance will also ensure smoother project execution.


 


The other measure is to set up an independent, ongoing institution to adjudicate between public interest and commercial interest. As external conditions change, the need for an umpire is inevitable. It is neither fair nor conducive to business confidence for the government to suddenly switch back from a player to an umpire role when circumstances require. In the water industry, the Office of Water Services in the U.K. and a similar regulator in Chile are good examples of such institutions. In China the mandatory use of public hearing processes in setting water tariff is also a step in the same direction.


 


From the private sector perspective, in particular for companies conscious of corporate social responsibility, the key to any PPP is not to make profit in one-off cosy deals, but to profit from efficiency gains in a stable environment. Public participatory processes at the planning stage and an ongoing, independent institution capable of taking longer-term perspective than governments normally do will certainly be conducive to a stable environment.


 


 


 Concluding Remark


 


To quote Principle 7 of the Melbourne Principles for Sustainable Cities: Empower people and foster participation.


 


“The journey towards sustainability requires broadly based support. Empowering people mobilises local knowledge and resources and enlists the support and active participation of all who need to be involved in all stages, from long-term planning to implementation of sustainable solutions.”


 


In order for city-dwellers to enjoy better quality of life, let us not be shy to put this into practice in all major infrastructure works.


 


 


 


2004年1月1日 星期四

為什麼普選是香港達到和諧良治的必要條件?

香港目前的公共管治已經呈現了三條日漸擴大的裂痕。由於這些裂痕的結構性本質,只有通過一個包含普選的制度性改革,才可以重新高香港的公共管治水平,達致和諧社會的目標。


 


第一條裂痕是價值脫節:香港市民近年來對於社會發展的方向已經逐步形成普遍的價值觀。這種可持續發展的價值觀與中央提出的科學發展觀基本一致。從近年來社會大眾對於維港填海、城市規劃、污染治理、文化保育、縮減貧富差距等議題的共識上已經可以看到,支持這些價值觀的不單是一般的公民團體,更包括專業人士以及不受特權利益所左右的工商界別(例如在如何規劃維港的議題上商界組成了一個廣泛的Harbour Business Forum,與政府立場迴異;香港總商會亦公開支持公平競爭法等等)。但由於香港政府受制於小圈子選舉的權力來源,以及從港英時代殘留的政務官官僚思維,政府把持的價值與市民形成共識的價值日益脫節,以致衝突不斷。


 


第二條裂痕是誘因失效: 在扭曲的問責制下,主要官員失卻誘因去為公眾謀取最大福祉。不管這些官員上任時是否有良好意願,他們難以堅持一些符合公眾利益、但無助於鞏固自身民望或討好權貴的長遠政策,更無意花精力做好一些跨範疇、跨部門的政策。例如需要有高度整合能力的可持續發展策略,或必須有長遠承擔的氣候變化對策,或促進社會公義的減貧政策,在現行制度下均無從開展。因為這些政策需要投入相當的政治資本,但其政治收益對特首或司局長的個人仕途來說太遙遠、太不確定。


 


第三條裂痕是程序腐蝕: 由於特首的產生欠缺普遍認受性,亦在制度上未能與立法會多數派政黨結盟,政府不惜用合法但不合理的方式侵蝕程序公義。每一次運用政治交易強行通過的政策都變成疏離民心的舉措,長此下去後果堪虞。在保育皇后碼頭一役,政府不惜破天荒地運用民政局長的權力,犧牲古物諮詢委員會的公信力,正是程序被腐蝕的例子; 程序腐蝕,正是行政權力膨脹的溫床。行政權力的過度膨脹,不但不適合香港多元化社會、朝著國際都會的方向發展,更會鼓勵特區首長和主要官員的獨裁傾向。這種獨裁傾向加上與市民脫節的價值取向,造成的效果正好與建設和諧社會的目標背道而馳。


2003年11月19日 星期三

Let the people decide

(Originally published in South China Morning Post, 2003-11-19 )


For the last three months, the heated debate on harbour reclamation has had many twists and turns. Public rallies were held; signature campaigns were launched; court battles were fought; legislators' stands were questioned; even media heroes have come and gone. Yet one puzzle remains: the government has not made any serious attempt to respond to the rising public aspirations, except to say that it is listening.


Either the public's voice has not been loud enough, or the government's hearing aid is defective. Neither is good for Hong Kong ; even less so for a society that badly needs a consensus to move ahead.


Senior officials from the Planning Department should be commended for standing up in front of the public to explain their case for reclamation. Yet on closer examination, no official has put forward any serious data to justify their central argument for reclamation: the need for the Central-Wan Chai bypass. The silence of the Transport Department is particularly disconcerting.


The need for publishing new data is obvious. The government has promised to scrap all harbour reclamation plans except those in Central, Wan Chai and southeast Kowloon . It has also promised that no commercial development will be allowed on newly reclaimed land. This means original traffic projections, which included those generated by the now-abandoned Western district reclamation, and other commercial developments, will no longer be valid.


It is only common sense that in such a dramatically changed scenario, a new cost-benefit analysis must be conducted. After all, the last feasibility study for the bypass was undertaken in 1989. Can anyone guarantee that the socio-economic assumptions made 14 years ago are still valid today? Can anyone be so cavalier as to spend $15 billion of taxpayers' money without taking a closer look? Without pre-judging whether the need for the bypass can be proven or not, there is no doubt that the public deserves more detailed information from transport officials.


The government's inaction is indicative of a bigger flaw: the lack of public participation in environmental decision-making. Current controversies in harbour reclamation and the West Kowloon Cultural District development alike have shown that the existing public consultation process is grossly inadequate. Hong Kong people have said loud and clear that they do not wish to leave important decisions concerning their urban space entirely in the hands of bureaucrats.


If officials are serious about upholding Chief Executive Tung Chee-hwa's commitment, in his 1999 policy speech, to sustainable development, they would do well to familiarise themselves with Principle 10 of the Rio Declaration, signed by China along with 177 countries at the 1992 Earth Summit. This is the famous access principle, applicable to environmental policymaking: every individual's right to have access to information, access to participation in decision-making and access to judicial proceedings for redress and remedy. Public consultation in its current form, coupled with a top-down approach in town planning, falls far short of the standard.


Getting people involved is not a purist's dream. International examples abound. Take, for instance, the other Victoria Harbour - on Vancouver Island in Canada . An independent, non-profit Harbour Authority was set up last year to own and manage harbour assets. The board of the authority is made up of representatives from governments, chambers of commerce and indigenous peoples. The Canadian public is not merely consulted; it is there to have its representatives make decisions, independent of the political process.


No doubt Hong Kong will develop its own model of governance when a Harbour Authority is set up, as is being demanded by many sectors. Yet a partnership approach engaging the private sector and civil society groups seems the only realistic chance for sustainable development.


For those of us who are wary of the divisive force that the recent controversy may inflict upon society, the best hope is to turn people's energy into a positive drive to develop and embrace a new and innovative mechanism for community-based urban design, public participation and consensus-building.


The People's Council for Sustainable Development, in partnership with four universities, three professional institutions and nine civil society groups, will launch a platform later this month for citizens to share their collective memories of the harbour, review the history of reclamation, examine constraints and opportunities, unleash their creative power and begin building a consensus through a public-hearing process.


In Hong Kong 's town planning history, this is an unprecedented attempt to empower people and foster participation through such a broad alliance in the third sector.


When provided with relevant information, Hong Kong people can be trusted to make wise decisions. It is, however, important that all planning constraints and potential opportunities are laid out for the public in a clear and coherent manner. Civil society has taken a lead to facilitate this process, but it is not too late for the government to play a constructive role by providing detailed information and participating in the process.


In the long run, whether reclamation is justified, whether reclaimed land should be used for road-building or for a waterfront promenade alone, and whether a statutory shoreline should be declared, will prove less important than establishing a process which truly reflects community value and allows the public to decide the future of its urban space.


A community-planning approach, with broad-based participation, has a much higher chance of success in building a consensus for the way forward than the current half-hearted persuasion by an embattled government. A successful consensus-building process will benefit everyone, including those for and against reclamation.


Albert Lai Kwong-tak is chairman of the Hong Kong People's Council for Sustainable Development.


 


 


2003年10月4日 星期六

The Missing Partner in West Kowloon

It is rare to see government officials embarking on world record-setting, brave new acts these days. Yet Hong Kong is lucky to have witnessed one on September  3.


The Chief Secretary announced on that day an invitation to the private sector to submit a single bid for the West Kowloon Cultural District. The development covers 40 hectares, equivalent to one-third of Kowloon Peninsular, and comprises four museums, three theatres, one amphi-theatre among millions of square feet of shopping, residential and commercial facilities. By all measures, it resembles a condensed new town in the heart of Hong Kong .


When announcing the scheme, Mr Donald Tsang, head of the government steering committee, was proud that the authorities had adopted the Norman Foster design to put 20 hectares of facilities under the world’s single largest canopy. For all its mind-boggling luxury the proposal looks like another grand, exciting plan for Hong Kong until one starts to examine what is missing.


The scheme adopts a Public-Private-Partnership approach, under which a single developer will be asked to finance, construct and operate the facilities for 30 years or more. This approach, first practised in the UK in 1980s, is not new. It has been applied to single-purpose infrastructure facilities such as toll roads, bridges, power plants, hospitals and even jails in some countries.  Yet the West Kowloon scheme sets two world records for PPP schemes: its sheer size of 40 hectares and its diverse mix of facilities under one scheme.


So we are sailing into uncharted territory where no city has attempted before. In essence, we are handing out a concession for a new town – designed as a special cultural icon for Hong Kong – to a single developer. Is this a blessing?


The essence of a PPP scheme is for a private sector developer to take up the risks of funding, building and operating public facilities with the promise that it is allowed to run the public facilities along commercial, private-sector principles. Note the interplay of the words public-private in the previous statement.


Two issues are most tricky in any PPP scheme: firstly, how to allocate equitably the risks between the public and the private sector and secondly, how to safeguard public interest when public facilities are controlled and run by private interests?


The first issue of risk allocation sounds like a mere technicality but it has a huge financial implication for either sides. One has to look only across the border: many PPP, or build-operate-transfer schemes as they are often called, such as power plants or toll roads in the mainland are re-negotiated after only a few years into operation because making long-term forecast, and hence allocating project risks in a changing environment is an enormously difficult task. This is difficult enough for a single-purpose facility; it is almost impossible for a new town like West Kowloon . When schemes become unstuck, concession contracts will be forced into re-negotiation and the side that has most at stake is often bullied into submission. Judging from past experience in Hong Kong , the public purse almost always loses out when confronted with hard-nosed private operators.


The second issue reveals a fatal flaw in the current scheme. Public interest in a PPP scheme can only be safeguarded by the participation of the third partner – the civil society.


A little dose of history here may help. The size of the first foreign concession in Shanghai was 55 hectares, only slightly larger than West Kowloon . It grew 60 times larger in a span of 70 years.


 


 


2003年10月3日 星期五

A sustainable solution

While many officials are worried about the erosion of government authority in the heated debate on harbour reclamation, the sea change in public opinion opens the way for a sustainable solution to protecting our harbour.


The Conservancy Association has been a long-time advocate of minimum harbour reclamation, ever since the Port and Airport Development Strategy and the Metroplan were first published in 1989. Over the years, numerous submissions were made to the authorities to urge that proposed reclamation work be scaled down.


Under the present system, uneasy compromises were the best solutions at the time. Nonetheless, the reclamation would have been much more destructive had the original plans gone ahead without amendments.


For instance, over the last five years, the Conservancy Association has been the lone voice protesting to the Highways Department, which kept pushing for the construction of a temporary road cutting across Edinburgh Square in front of City Hall. Without objections, both the square and the Queen's Pier - a historical monument bearing witness to the colonial era - would have disappeared long ago. Today, both are earmarked for demolition should phase three of the Central reclamation scheme go ahead.


The extent of harbour reclamation should ultimately be a reflection of public values. Does the public prefer a wider harbour to the benefits that another road link might bring?


Each of the proposed reclamation works must be assessed with regard to its specific context and the prevailing values of the community. The events in recent weeks showed clearly that the yardstick against which proposed reclamation should be measured has changed, for two reasons.


First, the courts have adopted a stricter interpretation of the Harbour Protection Ordinance. Second, the public now places a much higher value on the integrity of the harbour than the potential benefits associated with any reclamation.


Both the government and civil society have a duty to respond to these changes and apply the new yardstick. The fate of the harbour should not be beholden to any vested interest.


On closer examination, the real culprit of these controversies is an outdated mode of governance. The current institutions in the Transport Advisory Committee and the Town Planning Board are designed to help smooth the way for a pro-development administration, rather than allow full reflection of community values in public policies. Nearly all major reclamation proposals were justified by the need to build more roads to meet increasing traffic demand. Not surprisingly, when more reclaimed land is developed, more traffic demand will be generated. This is a self-fulfilling prophecy which has helped to shrink our harbour in the past few decades.


In the current standoff, we suggest a four-step process to handle the immediate crisis and to put in place a sustainable solution.


First, we support a temporary freeze on all harbour reclamation, regardless of the impending court ruling. After all, prevailing public values are the ultimate determinant for the future of our harbour.


Second, the government should appoint an independent panel of experts, to be chaired by a member of the judiciary, to review the scale and rationale of all proposed reclamation. Society should be given the chance to participate through public hearings.


Third, the government should begin setting up a Harbour Conservation Authority to take charge of the planning and execution of all projects in the harbour area. It should be endowed with a clear mandate to break the vicious circle. A new mode of governance should be adopted, using a roundtable concept, encompassing equal representation from the government, the private sector and civil society.


Fourth, the Town Planning Board should be reformed to give the public better access to decision-making. Its structure and membership-appointment system should be reviewed and the loophole that means transport infrastructure is subject to less stringent scrutiny should be plugged. Such a redesign should take place in the spirit of partnership, rather than under an administration-led system.


In public policymaking, goalposts do move with shifts in community values. Crying foul is never a solution. A wiser strategy is to embrace the new paradigm.


Albert Lai Kwong-tak is chairman of the Conservancy Association.


(Published on 3 October 2003, South China Morning Post)


 


 


A sustainable solution

(Originally published in South China Morning Post, 2003-10-3 )


While many officials are worried about the erosion of government authority in the heated debate on harbour reclamation, the sea change in public opinion opens the way for a sustainable solution to protecting our harbour.


The Conservancy Association has been a long-time advocate of minimum harbour reclamation, ever since the Port and Airport Development Strategy and the Metroplan were first published in 1989. Over the years, numerous submissions were made to the authorities to urge that proposed reclamation work be scaled down.


Under the present system, uneasy compromises were the best solutions at the time. Nonetheless, the reclamation would have been much more destructive had the original plans gone ahead without amendments.


For instance, over the last five years, the Conservancy Association has been the lone voice protesting to the Highways Department, which kept pushing for the construction of a temporary road cutting across Edinburgh Square in front of City Hall. Without objections, both the square and the Queen's Pier - a historical monument bearing witness to the colonial era - would have disappeared long ago. Today, both are earmarked for demolition should phase three of the Central reclamation scheme go ahead.


The extent of harbour reclamation should ultimately be a reflection of public values. Does the public prefer a wider harbour to the benefits that another road link might bring?


Each of the proposed reclamation works must be assessed with regard to its specific context and the prevailing values of the community. The events in recent weeks showed clearly that the yardstick against which proposed reclamation should be measured has changed, for two reasons.


First, the courts have adopted a stricter interpretation of the Harbour Protection Ordinance. Second, the public now places a much higher value on the integrity of the harbour than the potential benefits associated with any reclamation.


Both the government and civil society have a duty to respond to these changes and apply the new yardstick. The fate of the harbour should not be beholden to any vested interest.


On closer examination, the real culprit of these controversies is an outdated mode of governance. The current institutions in the Transport Advisory Committee and the Town Planning Board are designed to help smooth the way for a pro-development administration, rather than allow full reflection of community values in public policies. Nearly all major reclamation proposals were justified by the need to build more roads to meet increasing traffic demand. Not surprisingly, when more reclaimed land is developed, more traffic demand will be generated. This is a self-fulfilling prophecy which has helped to shrink our harbour in the past few decades.


In the current standoff, we suggest a four-step process to handle the immediate crisis and to put in place a sustainable solution.


First, we support a temporary freeze on all harbour reclamation, regardless of the impending court ruling. After all, prevailing public values are the ultimate determinant for the future of our harbour.


Second, the government should appoint an independent panel of experts, to be chaired by a member of the judiciary, to review the scale and rationale of all proposed reclamation. Society should be given the chance to participate through public hearings.


Third, the government should begin setting up a Harbour Conservation Authority to take charge of the planning and execution of all projects in the harbour area. It should be endowed with a clear mandate to break the vicious circle. A new mode of governance should be adopted, using a roundtable concept, encompassing equal representation from the government, the private sector and civil society.


Fourth, the Town Planning Board should be reformed to give the public better access to decision-making. Its structure and membership-appointment system should be reviewed and the loophole that means transport infrastructure is subject to less stringent scrutiny should be plugged. Such a redesign should take place in the spirit of partnership, rather than under an administration-led system.


In public policymaking, goalposts do move with shifts in community values. Crying foul is never a solution. A wiser strategy is to embrace the new paradigm.


Albert Lai Kwong-tak is chairman of the Conservancy Association.


 


 


2003年6月25日 星期三

長春社成立三十五週年

長 春 社 成 立 於 1  9 6 8 年 ,  由 最 初 單 純 的 志 願組 合,  演 變 成 現  今 一 個 全方 位 的 民 間 環 保 團 体  。相 信 當 年 創 辦 長 春 社 的 前 輩 們 也 很 難想 像 三 十 五 後 今 天 的 局 面 。


回 顧 過 去 ,長 春 社經 歷 了 不 少 動 蕩 的 歲 月 ,其 中 包 括 九 七 回 歸, 但  卻 能 生 存 至今, 無 疑 是 一 種 異 數 。 今 天 的 會 員 , 大 概 都 不 了 解  原 來 在 七十 年 代 ,長 春 社 曾 是 殖 民 地 政 府 的 監 視 對 象 之 一 , 在  秘 密 監視 團 体 名 單 中 榜 上 有 名。 八 十 年 代  ,長 春 社 又 曾 發 起 取 得 一百 萬 人 支 持 的「 反 對 建 大 亞 灣 核 電 廠 簽 名 運 動  」,卻 無 功 而 還。 從 七 十 到 八 十 年 代 ,長 春 社 在 幕 前 和 幕 後 做 了 大 量 的 游 說 工 作 , 催 生 香 港 政 府 成 立 了 環 境 保護 署 。


為 什 麼  長 春 社 在 動 蕩 的 歲 月 裏 仍 然 能 繼 續 生 存 壯 大 ? 答 案 可 能 只 有 一 個:  就 是 香 港 民 眾 都 認 同 長 春 社 存 在 的 價 值 , 需 要 它 來  協 助 磨 平 發 展 帶 來 的 稜 角 。 雖 然 這 些 稜 角 依 然 時 刻 存 在 , 但 只 要市 民 知 道 環 保 組 織 正 在 努 力 把 它 磨 平  , 大 部 份 人 還 是 稍 感安 心 的 。 至 於 這 些 努 力 是 否 白 費 , 還 是 帶 來 深 遠 的 社 會 影 響 , 就 得 看 長 春 社 如 何 堅 持 下 去 了。


然 而 ,長 春 社 背 後的 真 正 力 量 , 卻 是 來 自 社 群 ,就 正 如 我 們 所 有 的 會 員 , 都 是 關 心 環 境 的 社 會 份 子 。正 是 這 些 不安 於 本 港 環 境 現 狀 、不 斷 要 求 變 革 的 社 會 人 士 在 推 動 長 春 社 前 進 , 成 為 了 它 壯 大 的 動 力  。


英 國 近 代 文 豪 王爾 德 曾 說 :「 我 們 對 歷 史 的 唯 一 責 任 ,就 是 把 它  改 寫 。」只 要大 家 看 到 長 春 社 的 會 員 和 員 工 對 環 保 信 念 的 堅 持 , 就 會 相 信 在 未 來 三 十 五 年 , 長 春 社 縱 然 未能 改 寫 香 港 環 保 運 動 的 歷 史 , 也 必 可 在 這 頁 歷 史 上 留 下 印 記


2003年6月